Code of practice for programme management
See update Code of Practice for Programme Management in the Built Environment. Second edition
On 26 September 2016, CIOB (The Chartered Institute of Building) launched its first Code of Practice for Programme Management: In the Built Environment.
The new code follows on from the Code of Practice for Project Management for Construction and Development, first published in 1992. It was developed by representatives from industry institutions including the CIOB, RICS, RIBA, ICE and APM, as well as key government departments, industry, and universities.
Programme management is the process of managing several related projects, often with the intention of improving an organisation’s performance. It is closely related to systems engineering, industrial engineering, change management, and business transformation.
The code explains the processes and procedures to be followed when managing a built environment programme. It sets out the requirements for effective programme management, ensuring systematic quality control and documentation through governance arrangements and explains the benefits of managing a number of connected projects as a programme.
It is intended for programme and project management professionals, but will also be of interest to advanced undergraduates and postgraduates.
Paul Nash, CIOB president, said: “This first publication of a Code for Programme Management is particularly apt as I believe it ties in with the current big issues of governance, reporting and ethics. Such programmes have been around for infrastructure for a long time and it’s about time construction had such a guide. It’s interesting for me personally as I’ve been involved in this area for years in both the private and public side. It’s a good mix of academic and practical and I think it’s a guide anybody can pick up. It’s about time we had something like this for the industry.
Table of contents:
- Introduction
- Chapter 2 Stage A: Inception
- Chapter 3 Stage B: Initiation
- Chapter 4 Stage C: Definition
- Chapter 5 Stage D: Implementation
- Chapter 6 Stage E: Benefits Review and Transition
- Chapter 7 Stage F: Closure
- Appendices
- Programme Management Case Studies
- Bibliography
- Index
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.