Code of practice for programme management
See update Code of Practice for Programme Management in the Built Environment. Second edition
On 26 September 2016, CIOB (The Chartered Institute of Building) launched its first Code of Practice for Programme Management: In the Built Environment.
The new code follows on from the Code of Practice for Project Management for Construction and Development, first published in 1992. It was developed by representatives from industry institutions including the CIOB, RICS, RIBA, ICE and APM, as well as key government departments, industry, and universities.
Programme management is the process of managing several related projects, often with the intention of improving an organisation’s performance. It is closely related to systems engineering, industrial engineering, change management, and business transformation.
The code explains the processes and procedures to be followed when managing a built environment programme. It sets out the requirements for effective programme management, ensuring systematic quality control and documentation through governance arrangements and explains the benefits of managing a number of connected projects as a programme.
It is intended for programme and project management professionals, but will also be of interest to advanced undergraduates and postgraduates.
Paul Nash, CIOB president, said: “This first publication of a Code for Programme Management is particularly apt as I believe it ties in with the current big issues of governance, reporting and ethics. Such programmes have been around for infrastructure for a long time and it’s about time construction had such a guide. It’s interesting for me personally as I’ve been involved in this area for years in both the private and public side. It’s a good mix of academic and practical and I think it’s a guide anybody can pick up. It’s about time we had something like this for the industry.
Table of contents:
- Introduction
- Chapter 2 Stage A: Inception
- Chapter 3 Stage B: Initiation
- Chapter 4 Stage C: Definition
- Chapter 5 Stage D: Implementation
- Chapter 6 Stage E: Benefits Review and Transition
- Chapter 7 Stage F: Closure
- Appendices
- Programme Management Case Studies
- Bibliography
- Index
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.